Summary: A sample order is two or three pieces shipped before a container commitment. Since 1 July 2026 it is no longer duty-free in the EU, and the US $800 de minimis suspension is now indefinite, so a trial carries its own customs file. Here is what two pieces can prove, what each route costs in chargeable kilos, and how to make the trial predict the container.

The cheapest mistake in this trade is a container ordered from photographs. The second cheapest is a sample ordered without knowing what it now costs to clear. Both are made by serious buyers, usually in the same week, and both are avoidable with arithmetic a procurement officer can do in twenty minutes.
In eighteen months the rules on small shipments have changed more than the rules on containers. A trial that once arrived duty-free now needs its own entry, valuation and, in Europe, its own due-diligence statement. Sampling is still the cheapest risk reduction in the trade; it is simply import work now.
What changed for a two-piece sample in 2026
Start with the part buyers discover at the airport. Until 30 June 2026 a consignment into the EU worth €150 or less entered free of duty. From 1 July 2026 the European Commission applies a flat €3 duty per item on low-value consignments up to €150, running until 1 July 2028, after which normal tariff rates return (Directorate-General for Taxation and Customs Union, 8 June 2026). Two pieces arrive with a €6 duty line before VAT, and VAT is charged on goods plus freight plus that duty.
The United States moved earlier. The $800 exemption was suspended on 29 August 2025, and a Customs and Border Protection interim final rule effective 24 June 2026 made the suspension indefinite for every mode except the international postal network: entries of $800 or less must now use formal or informal entry (Federal Register, 24 June 2026). A sample shipped to a US address is a customs entry, not a parcel.
| Market | What changed for a small consignment | In force | Source |
|---|---|---|---|
| EU | €3 flat duty per item on consignments up to €150; old duty exemption ended | 1 July 2026 | European Commission, DG TAXUD |
| EU | Deforestation due diligence covers wood products, samples included | 30 Dec 2026; SMEs 30 June 2027 | European Commission, EUDR |
| US | $800 de minimis suspended; formal or informal entry required | Indefinite from 24 June 2026 | CBP interim final rule |
| UK | Duty on HS 9403.60.90 (other wooden furniture) 0%, VAT 20% | Checked November 2026 | UK Trade Tariff |
One consequence is easy to miss. From 30 December 2026 a wooden sample entering the EU falls inside the same due-diligence regime as a container, because furniture is made from wood listed in Annex I of the deforestation regulation. If your compliance team has not seen a supplier's plot-level file, a sample is the cheapest place to test it.
What two pieces can prove, and what they never will
A sample is not a preview of the catalogue. It tests four things a photograph cannot show, in the order buyers usually rank them.
- Weight and balance. A 100 cm teak root dining table weighs more than the photograph suggests, and the base either sits flat on a stone floor or it does not.
- Finish under your own light. The same oil looks grey in a north-facing Rotterdam showroom and warm in a Dubai mall. Colour is the commonest reason a first container is rejected, and no colour card fixes it.
- Whether the packing survives. Carton, foam, corner protection and the way a glass top is separated from the base decide your damage rate more than the timber does.
- Whether the factory answers after the invoice is paid. The cheapest signal in the whole exercise, and the one buyers forget to record.
What two pieces will never prove is consistency across sixty. Root furniture varies piece by piece, so the question is whether the factory has a grading rule and applies it without you in the room. Nor do they prove the kiln schedule or the load plan; those belong to a pre-shipment inspection with defined checks, which is a different instrument.
Three ways out of Jepara, and the arithmetic that decides
Every trial leaves Jepara, Indonesia, by one of three routes: air express, air freight through a forwarder, or a slot in a container that is already loading. The cost difference is a matter of kilos, because air bills the greater of actual and volumetric weight at 1:6,000 — one cubic metre of carton counts as about 167 kg whether the piece inside weighs 40 kg or 140 kg.
| Sample piece (catalogue code) | FOB USD | Packed volume | Chargeable kg by air | Air freight at USD 5/kg |
|---|---|---|---|---|
| Teak root stool, 35 cm (TRS-001) | 45 | 0.055 CBM | 9 | 45 |
| Coffee table with glass top, 100 cm (TRT-085) | 115 | 0.40 CBM | 67 | 335 |
| Dining table, 100 cm diameter (TRT-057) | 195 | 0.75 CBM | 125 | 625 |
Volumes come from our own price list; chargeable kilos use the 1:6,000 rule. The USD 5/kg column is a placeholder — use your forwarder's quote. The ratio matters, not the rate.
Read the last two columns against the second. Flying a stool costs roughly its FOB value; flying a 100 cm dining table costs more than three times its FOB value, because the airline bills 125 kilos for a piece that weighs a fraction of that. Which is why experienced buyers sample the piece they are least sure about: if the uncertainty is in the finish, a coffee table answers it; if it is in the base, a table base does the same job at a third of the volume.
Air freight through a forwarder, rather than an express courier, moves the entry to your broker: usually cheaper on duty, two to four days slower. A slot in another buyer's container is cheapest per piece and slowest, because your pieces travel on their schedule and the documents must be split cleanly at destination. In our experience air express is worth the premium when a hotel mock-up room has a date; the shared container is worth the wait when the trial is exploratory. And air rates climbed through the 2026 peak as capacity tightened (The Loadstar, November 2026), so ask for a quote valid on the week of pickup and compare chargeable kilos before prices.
If you already know which two pieces you want to test, send the item codes and your delivery city; we will return the FOB value, packed volume and carton dimensions your forwarder needs.
Send your item list for a quote →
The paperwork that decides whether your sample clears or sits
Customs does not care that a shipment is called a sample. It cares what the goods are, what they are worth and whether the wood is legal. "Samples of no commercial value" is the most reliable way to have a consignment held: a value still has to be declared, and an officer who sees zero will assess the goods himself.
- Commercial invoice with a real value, marked "sample, not for resale", showing the HS code. Wooden furniture sits under heading 9403.60; the subheading decides the duty line.
- Packing list with carton dimensions and gross weight — what your forwarder uses for chargeable weight, and your broker uses if the entry is queried.
- An ISPM 15 mark on any solid-wood crate or pallet. The IPPC standard covers wood packaging from raw wood, including dunnage, and excludes processed material such as plywood. An unstamped crate is grounds to refuse the consignment.
- A due-diligence reference for the EU. From 30 December 2026 the importer files a statement citing the plot of harvest. Ask for the geolocation file before you book.
- An EORI number in the EU, or an importer of record in the US. Couriers will act as importer of record by default and bill duty, VAT and a disbursement fee afterwards; the fee is small, the surprise is not.

The UK is the straightforward case: duty on "other wooden furniture" under 9403.60.90 is 0% and VAT is 20% (UK Trade Tariff, November 2026). VAT and the courier's handling charge still land on your account, but the classification argument that slows a first shipment disappears. If you import teak root furniture from Indonesia into several markets, keep one HS-code sheet for the range and reuse it across quotations. Brokers change; codes should not.
How to run the trial so it predicts the container
A trial without written acceptance criteria is a shopping trip. Before the pieces leave Jepara, Indonesia, write down what would make you reject them and send that list to the factory. It is a short document and it changes everyone's behaviour.
- Fix the finish by name, not by adjective. "Natural oil, matte, no stain" travels; "natural look" does not. Ask for a finish panel if the project has more than one phase.
- Measure three dimensions per piece against the spec, with a stated tolerance. Five millimetres is normal for hand-worked root; twenty is another conversation.
- Take a moisture reading on arrival. We kiln-dry to 8–12%. A reading above 14% after a week in your warehouse will move in a heated room.
- Photograph the packing before you open it, including corner protection and how the glass top was separated. That is your baseline when the container lands.
- Log response times. A supplier who answers in four hours during sampling is telling you something about the twelve weeks that follow.
- Decide within ten working days. Samples that sit in a corridor for a month become a decision made by whoever is least busy.
Save third-party inspection for the container. Most firms work to ANSI/ASQ Z1.4 with an AQL of 2.5 for major defects, a plan designed for lots of dozens or hundreds; applied to two pieces it produces a number with no statistical meaning. Use the sample to set the standard, then inspect to check that it held.
Where the pieces come from: drying wood in the rainy season
The trial pieces are made in Jepara, on the north coast of Central Java, a town of carving workshops where teak root has been furniture material for longer than most of our buyers have been in business. Roots come out of plantation renewal and land clearing, which is why no two pieces share a shape: material is sorted by size and figure, not cut to a drawing.
That makes timing matter. Between November and March the workshop works around rain, and a root that arrives wet takes longer in the kiln. Drying is what buyers underestimate: three to four weeks is normal for a thick section, and rushing it is how a table splits in its first heated season. We would rather move a sample date by a week than shorten a cycle, and we say so at quotation.
The workshop loads four 40-foot high-cube containers a month and has shipped more than 300 since 2016, mostly to importers, hotel groups and interior contractors in Europe and North America. That volume is why a two-piece trial is possible and why we can tell you, before you commit, which pieces fly well and which should wait for a container. If you are comparing suppliers, the questions that separate a workshop from a trading desk are in our guide to choosing a furniture manufacturer, and most are answerable in one video call.
What we do on a trial order
Our trial quantity is two pieces, not one. One piece tests the product; two test whether the workshop can repeat itself, which is the risk you are reducing. Pieces are photographed and measured before dispatch, finished to the specification you intend to order at volume, and packed as a container order would be packed.
If the trial leads to a container we credit the sample's packing cost against the order. We do not credit air freight: a real cost of getting the piece to your door, and absorbing it would only inflate the container price. A production order starts at one 20-foot container, mixed SKUs, no minimum per model, about twelve weeks from deposit to loading.
Frequently Asked Questions
Is a two-piece sample still duty-free when it enters the EU?
No. Since 1 July 2026 a flat €3 duty applies per item on consignments up to €150, and the old exemption ended on 30 June 2026. Two pieces means €6 before VAT, which is charged on goods, freight and duty. The flat fee runs until 1 July 2028.
Do I need a customs broker to receive a sample in the United States?
The shipment needs an entry, not a broker specifically. The $800 exemption has been suspended since 29 August 2025 and indefinitely since 24 June 2026, except for the postal network, so a two-piece air shipment must clear through formal or informal entry. Most buyers let the courier file as importer of record and settle duty afterwards.
Will the sample have the same moisture content as a container order?
It leaves the kiln on the same schedule at 8–12%, but one piece in an aircraft cabin and a container crossing the Indian Ocean do not dry at the same rate. Read the meter on arrival and again after a week; above 14% is a conversation about storage as much as about the kiln.
Can my sample travel inside another buyer's container?
Yes, and it is the cheapest option per piece. Your cartons travel under a separate house bill of lading, so invoices separate cleanly at destination. The trade-off is control: your sample arrives when their container loads, and if their production slips, so does your trial.
Talk to us about your project
Send the item codes you want to test, the delivery city and the date you need the pieces in hand. We will reply with the FOB Semarang price, packed volume, carton dimensions and a realistic dispatch date, normally within one working day. If the trial is for a hotel mock-up room, say so: the schedule and the packing differ.
Send your item list for a quote →
Packing, loading and shipping

Each piece is wrapped in foam and single-face carton, glass tops packed separately, corner protection on every edge that can meet a container wall. Tables are stacked base to base with a card divider, stools go two or three to a carton, and the load plan is drawn before the container arrives, so the last carton in is the first out. The packing list matches carton numbers to item codes, which is what your broker needs if a line is queried.
Where does the container actually leave from? Loading happens at the workshop in Jepara, on the north coast of Central Java, and the truck run to Semarang port is 65–70 km — about two hours on a good morning. Every carton is checked against the packing list before it goes on the truck, the container is sealed at the yard, and the seal number goes on the bill of lading. FOB Semarang is our standard term; if you prefer CIF or DAP, say so at quotation, and we will price it with your forwarder.
Our office and factory stand at the same address on every document we issue: Jl. RA Rukmini KM.02 Pekalongan RT.02/V, Tahunan, Jepara 59428, Central Java, Indonesia. Buyers are welcome to inspect before loading, and we would rather you did.
MOQ 1×20'FCL mixed · 4×40'FCL per month · 300+ containers shipped since 2016 · export@teakrootfurniture.com
Written by
Mr. August Praymunor — Overseas Marketing Director
CV. Nusantara Sourcing Agent · manufacturer and exporter of teak root furniture in Jepara, Central Java, Indonesia. We have shipped over 300 containers since 2016, loading 4×40’FCL per month for importers, hotel groups and interior contractors in Europe and North America. Every figure in this article comes from the sources named in the text or from our own price list and shipping records.
export@teakrootfurniture.com · WhatsApp +62 852 0600 7878 · LinkedIn · Jl. RA Rukmini KM.02 Pekalongan RT.02/V, Tahunan, Jepara 59428, Central Java, Indonesia